Manual mechanical cleaning and protection with a cementitious product (Tecniblock Rust) of the reinforcing steel of the TBT-11 tank.
Excavation of the foundation for the TP-04 gas pipeline support.
Cutting, bending, and assembling reinforcing steel for various structures.
Placement of a product to join the old concrete with the new concrete.
Poured the walls of the TG-7 and TBT-08 tanks.
Poured the walls of the omega-shaped structure that will protect the SCI pipeline.
Taking samples from the poured cylinders.