Manual mechanical cleaning and protection with cementitious product (Tecniblock Rust)

Formwork for the floor slab of the TG-7 outlet manhole.Formwork for the pipe support foundations.Fabrication of the CTM-03 pipe channel covers (road crossing).Excavation of a trench for the grounding cable to the west of TG-7.Redesign of the pipe support foundations.Excavation of foundations for pipe supports.

Continue ReadingManual mechanical cleaning and protection with cementitious product (Tecniblock Rust)

Topsoil removal, concrete separator storage, and reinforcing steel bending

Topsoil removal, Concrete separator storage, Reinforcing steel bending Topsoil removal, concrete separator storage, reinforcing steel bending, reinforcing steel bent and stored. Topsoil removal (Including asphalt), Topsoil removal (Including asphalt), Topsoil removal (North side), Topsoil removal (South side), Topsoil removal (Indicating 30 cm thickness). Concrete separator manufacturing, manual mechanical compaction of pits (removed)

Continue ReadingTopsoil removal, concrete separator storage, and reinforcing steel bending

Slab formwork, foundations. Pipe channel cover manufacturing.

Manual mechanical cleaning and protection with a cementitious product (Tecniblock Rust) of the reinforcing steel of the TBT-11 tank.Excavation of the foundation for the TP-04 gas pipeline support.Cutting, bending, and assembling reinforcing steel for various structures.Placement of a product to join the old concrete with the new concrete.Poured the walls of the TG-7 and TBT-08 tanks.Poured the walls of the omega-shaped structure that will protect the SCI pipeline.Taking samples from the poured cylinders.

Continue ReadingSlab formwork, foundations. Pipe channel cover manufacturing.